一、验水电
I. Hydropower Inspection
验一下房子的水电是否通了。当然对于一些高级办公室装修来说,多数的水电后期都要替换的,所以有时候这些内容倒不是要害的,但若不打算替换水电的话,那这些东西就必须仔细检验。除了看看是否通了电外,还要看电线是否符合国标质量,再就是电线的截面面积是否符合要求。
Check the electricity and water in the house. Of course, for some high-level office decoration, most of the hydropower later to replace, so sometimes these contents are not critical, but if you do not intend to replace hydropower, then these things must be carefully checked. In addition to checking whether the power is on, it also depends on whether the wire meets the national standard quality, and then whether the cross-sectional area of the wire meets the requirements.
二、验管道
II. Pipeline Inspection
这儿所指的管道,指的是排水/污管道,犹其是阳台之类的排污口,检验时,预先拿一个盛水的用具,然后倒水进排水口,看看水是不是顺利地流走。为什么要检验这个呢,因为在工程施工时,有一些工人在清洁时往往会"偷"这个工。把一些水泥渣倒进排水管流走,假如这些水泥较粘的话,就会在弯头处堵塞,形成排水。
The pipeline referred to here refers to the drainage/sewage pipeline, especially the sewage outlet such as the balcony. When inspecting, take a water-holding device in advance, and then pour water into the drainage outlet to see if the water is flowing smoothly. Why do you want to test this, because in the construction of the project, some workers often "steal" the worker when cleaning. If some cement slag is poured into the drain pipe to flow away, if the cement is more sticky, it will clog at the elbow and form drainage.
万德装修-办公室装修2
Wande Decoration - Office Decoration 2
三、验地平
3. Testing the horizon
验地平就是测量一下离门口远的室内地上与门口内地上的水平误差,很多时候也能够体现发展商的建筑质量。因为作为业主方,根本是不可能去检验主体结构的。那么就只能从这些细节来看质量了。测量的办法若不嫌费事,办法也很简单。去五金店买一条小的透明水管,长度约为20米左右吧,然后注满水。先在门口离地上0.5米或1米处画一个标志。然后把水管的水位调至这个标志高度,并找个人固定在这个位置。然后把水管的另一端移至离门口远处的室内。然后看水管在该处的高度,然后再做一个标志。然后用尺测量一下这个标志的离地高度是多少,这两个高度差就是房子的水平差。
Horizon testing is to measure the horizontal errors between indoor ground far from the entrance and the interior of the entrance. It can also reflect the quality of the developer's buildings in many cases. Because as the owner, it is impossible to test the main structure. So we can only see the quality from these details. The method of measurement is simple if it is not too troublesome. Go to the hardware store and buy a small transparent water pipe, about 20 meters in length, and fill it with water. Draw a sign at the entrance 0.5 or 1 meter above the ground. Then adjust the water level of the pipe to the mark height and find someone to fix it. Then move the other end of the pipe to the room farthest from the door. Then look at the height of the pipe and make a sign. Then use a ruler to measure the height of the sign off the ground. The difference between the two heights is the level difference of the house.
四、看墙面
4. Look at the wall
不知道从什么时候开始,看墙面居然成为房子检验的首要问题。其实即使是在20世纪80年代建的房子都没有现在的房子那么弱不禁风。所以检验好是在房子交楼前,下过大雨的第二天前往观察一下。这时候墙面若有问题,几乎是无可遁形的。墙面除了渗水外,还有一个问题,就是墙面是否裂纹。乳胶漆是目前常见的墙面装修资料,在详细施工中能够进行涂刷、辊涂或喷涂。假如工人在施工时不仔细或敷衍了事,常会出现细小的色差,尤其是颜色较深的乳胶漆更会出现这种问题。
I don't know when to start, looking at the wall has become the first problem of house inspection. In fact, even the houses built in the 1980s are not as weak as those built today. So the best way to check is to go and observe the house before it turns in and the next day after heavy rain. At this time, if there is a problem with the wall, it is almost invisible. In addition to seepage, there is also a problem, that is, whether the wall cracks. Latex paint is currently the most common wall decoration information, in the detailed construction can be brushed, rolled or sprayed. If the worker is not careful or perfunctory in the construction, there will often be slight color difference, especially in darker latex paint.